Page 2 - New England Site Investigation and Timeline
P. 2

$100  NEW ENGLAND                                                                                                      More designs
      Indicative Minimum Timetable
                                                                                                                       Over 1500 Homes, Duplexes, multi-family and granny flats
             TIME FROM                       Select house plan &                             Order and Pay Site
         COMMENCEMENT                       finalise cost variations                          Investigation Fee        More flexibility
      (registered blocks only)
                                            Obtain Site Specific information.                   Base site costs        Speedy modifications and costings - floor plans and elevations

                                               (The Owner(s) shall not rely upon the             (Does not include)    More steel
                                                results of our enquiries and should               - Ident. Surveys
                                            investigate and notify us of all block specific                            Steel frames, trusses and Metal roof included
                                                requirements prior to Site Costing)                   - Power
                                                                                              - Sewer Connect Point    More concrete
                                             Prepare Site costs/Estimate
                                                                                                  - Water Meters       Conventional footings and slab - 80% more than Waffle Pods
                                                                                             - Rock Breaking/ Removal
                                                                                                                       More glass
                                                                                                   - Pump Wells
                                                                                             - Acoustic Requirements   80% thicker than minimum, tinted window glass
                                                                                             - BOS/Relax/MCU approv
                                                                                                                       More Premium inclusions
      AVERAGE ADMINISTRATION TIME 12 WEEKS  Finalise Colour Selection                        Draw Plans
                                                                                                                       Premium appliances and tapware
$600                                        Sign all documentation      Pay pre-approval stage fee
                                                                                                                       More advanced management systems
                                                       inc. contract
                                                                                                                       Third party quality assurance certification
                                            Covenant approval (by owner(s))
                                                                                                                       More extensive warranties

                                                                                                                       50 year limited structural warranty

                                                                                                                       More homes built

                                                                                                                       Home to 80,000 Australians

                                                                                                                       More Building Industry Awards

                                                                                                                       Over 100 in total

                                                                                                                       More offices

                                                                                                                       14 offices / selection centres, 24/7 web-based information system

                                                                Builder signs Contract

                                            Lodge plans with certifier  Lodge drainage plans with
                                                                                  council

                                            Issue orders + Distribute plans

                                            Receive Certification (4-7 weeks) incl. drainage, relax & BOS                                     Less up-front costs
                                                                   where required
                                                                                                                                       $100 soiltest and survey fee, $700 total deposit
                                            Owner to supply town planning & MCU approval (10-12 weeks)
                                                                                                                                         Less expensive to buy
                                            Owner to supply Unconditional Finance approval from
                                                     Lender OR to finalise Joint Account                                                           Best price guarantee for better value

                                                                                                                                                   Less living costs

                                                                                                                               Solar power PV and solar hot water, 6 star Energy rating

                                                                                                                                                                 Less risk

                                                                                                                                      ASX Listed debt free Australian owned company

                                                                Building commences

      AVERAGE CONSTRUCTION TIME 24 WEEKS    Slab Down Pay       Inspections                  Certificates              BEST PRICE GUARANTEE
                                            15% less fees paid
                                                                 3 Statutory                 4 Compulsory              We save you a minimum of
                                                                 5 Additional                 8 Additional             $5,000 for every $100,000 on
                                                                                                                       a home of a similar size &
                                            Frame Up Pay        Inspections                  Certificates              design with equal or better
                                                 15%                                                                   inclusions, or we will refund
                                                                 1 Statutory                 4 Compulsory              your preliminary fees in full,
                                                                 3 Additional                 1 Additional             up to 30 days from signing
                                                                                                                       the contract.
                                            Enclosed Pay        Inspections                  Certificates
                                                 35%                                                                                                           Only applies to Dixon HomesQSE
                                                                 1 Statutory                 2 Compulsory
                                                                 4 Additional                10 Additional             LEGEND  Owner             Preliminary

                                                                Inspections                  Certificates                      Pre-Construction  Construction

                                            Fixing Pay 20%       3 Additional                1 Compulsory              Liquidated Damages:
                                                                                              5 Additional             Contract Price (less any other rebates to the Owners’:
                                                                                                                       ≤ $100,000 = $50/day; $100,001 to $200,000 = $60/day;
                                            Inspections Certificates Practical completion                              >$200,000 = $70/day.

                                            1 Statutory 4 Compulsory Pay 15% Final Payment                             All times are based on information collated from the past 6 months
                                                                                                                       and do not reflect future minimum times which may be affected by
                                            5 Additional 11 Additional                       and Hand Over             inclement weather, supply disruptions or labour availability.
   1   2